Simple  4  step process


Stage 1 - planning & quotation  (1-2 weeks)

1A)                 Designing your Irrigation area and Envirotech location.

A wastewater design and site visit (provided by Envirotech) is required to design the treatment system location and disposal area for each property based on property type, local council regulations and site overlays.

"A wastewater design (site & soil assessment) is a council requirement and must be completed to provide a site specific quotation and gain council approval prior to the installation of any wastewater treatment system".

1B)                 Providing a site specific quotation based on wastewater design. Once the wastewater design has been completed by Envirotech or an existing wastewater design has been received, we can generate a full quotation for your site.  

Stage 2 – council application & installation (2-4 weeks)

2A)                 Review & acceptance of quote.

Please contact us with any questions during review of your quote and we will be happy to provide any assistance to ensure you have a sound understanding. Once the job has been accepted a 50% deposit is required to book your installation. (balance is required 48 hrs before installation date).

2B)                 Council application & approval

After stamped design and approved council application is received, we confirm the next available install date. (General allowance is one full day for new builds or two full days for converting and dismantling existing septic systems - site dependent).

Name Contact number E-mail Site address Number of bedrooms
New build OR replacement of existing septic?
I'm building a new house on a blank block
I'm renovating and replacing an existing septic
I'm building a new dwelling on an existing block that needs a treatment system
Do you have a wastewater design (Site & soil assessment)? Additional information (optional) Submit